Agile Estimation Techniques

article image

Table of contents

    Future-proof your business.

    The traditional estimation method follows the bottom-up technique where the requirement is broken down into small tasks, and each job is given an estimated duration of time. Finally, all of these time figures are added to provide an estimation of the schedule. In contrast to this, Agile projects have a top-down approach. There are varied Agile estimation techniques, and we will discuss a few of the popular ones here.

    There are three levels at which Agile estimating takes place – Project level, Release Level, and Sprint level. The estimation techniques are used for doing a comparative analysis by team members to prioritize Product Backlog items, depending on their perceived size. The key people involved in Scrum estimation techniques are – Product Owner, Developers, Scrum Master, Testers, and other Stakeholders. The Product Owner introduces the items and initiates discussion or estimation. Discussions are a must in such estimating meetings, and the Product Owner must be available to clear all the queries related to the items.
     

    1. Planning Poker or Fibonacci sequence
     

    The Fibonacci sequence is a mathematical series that is generated with the addition of the last two numbers. For example, the arrangement goes like 0, 1, 1, 2, 3, 5, 8, 13 and moving on. For Agile estimation, the sequence used is 1, 2, 3, 5, 8, 13, 20, 40, 100, and on. These numbers come in the form of playing cards. The estimation takes place by playing a planning poker game. The way the game proceeds is as follows:
     

    • There are as many numbers of a set of cards as team members. Each set is distributed to every team member.
       
    • The business owner takes up every item one by one. Each of these items needs to be estimated.
       
    • Each item is taken up for discussion.
       
    • When the business owner presents an item, all team members select a card to deliver an estimate.
       
    • When everyone has selected a card, they reveal the cards altogether. 
       
    • There are two situations here – if all the members have selected the card, then the item is given that point estimate.
       
    • If the card point values are different, then the business owner initiates a discussion to get the estimated value. The team member who has selected the lowest value is asked to explain.   And the one who has given the highest value is also asked to describe the same. 
       
    • After this, the process is repeated. It continues till an agreement on the estimate is arrived at, or conversion occurs.
       
    • In case the conversations turn lengthy, then a time-boxed timer of 2 minutes is selected to discuss the item. It is continued till the time an estimated conversion is reached.
       

    In this process of Agile estimation techniques, most teams spend about two minutes on every item. That means that 30 items will take about an hour of discussion. Also, it is essential to note that there are nine value-point choices with team members – this helps ensure that the process takes place fast. 
     

    2. Affinity Grouping or Mapping 
     

    Affinity Mapping is another Agile estimation technique. Depending upon the efforts that would go into an item, it is sized up by team members. Firstly, the Product Owner needs to place two cards: small and big, on two opposite walls of the room. This method is used when the number of items being discussed is large. It enables faster decision making and the flow is as follows:
     

    • The purpose of the team meeting is to place similar items under one sub-group. 
       
    • The business owner presents every item and the Product Owner gives the items to each team member, and they are asked to size each item. The Product Owner clears team members queries if any. Based on the perceived effort that would be required for each item, the team members place the items into Small or Big.
       
    • It is then pasted on the wall or a board.
       
    • After the first item, the second item is ready for the team. Now the team decides if the item being discussed is small or big. If it is significant, then it is placed on the right side of the item, and if the item is smaller than the first item, it is placed on the left.
       
    • Then, the third item is presented. The team is asked to estimate the value of this item vis-à-vis the first and the second item. Then, the item is placed accordingly.
       
    • Similarly, all the items on the list are pasted first. No discussions are allowed here.
       
    • Once the activity stops, discussions are initiated by the PO. The items can go from one wall to another before the final call is taken by the Product Owner. 
       
    • It enables multiple items to be discussed fast. Items that team members feel have been placed wrongly are taken up for discussions for appropriate placement. 
       

    Affinity Mapping is an excellent technique to follow if the items to be discussed are less in number. This method should be used when the team size is small. In the case of larger teams, or when the number of items to be discussed is more, it is advisable not to use this method.
     

    3. T-shirt sizes
     

    We all know that there are five sizes to choose from – extra-large or XL, large or L, medium or M, small or S, and extra-small or XS. In this Agile estimation techniques, the project size is estimated based on these five t-shirt sizes. This method offers an approximate estimate. It gives the team an estimate of the amount of work required to be done in the project. The estimates are given numbers. In this method, discussions happen to give approximate estimates. This method is an informal method, which is why things can get confusing and challenging. The technique also believes in open discussions.
     

    4. Dot voting
     

    This Scrum estimation technique helps rank items in the Product Backlog as per priority. The business owner needs to start the method by posting the user stories on a board or a wall. The stories need to be accompanied by a suitable description and distinguishable from the other stories pasted.  All team members are provided with markers and dots. They need to mark the user stories with the dots in order of preference or ranking. 
     

    Once this marking exercise is complete, the leader takes up the stories one-by-one. The sequence followed is highest priority to lowest priority. The highest priority is the one that has received maximum dots. The discussion is followed by voting and repeated until a consensus on the importance is reached. 
     

    The Dot marking method is not a conventional estimation technique but proves to be handy when the number of user stories or items to be discussed is less.
     

    5. Bucket System
     

    This Agile estimation system uses cards with values 0 to 8 and then 13, 20, 30, 50, 100, and 200. More cards with higher values can also be used for the method. These cards denote buckets in the order of priority. Every user story is taken up, discussed, and then placed in a bucket. The cards can be rearranged; discussions can occur if there is no consensus amongst team members until an agreement is reached.

    Many estimators believe that this method is way more effective than the Planning Poker technique, with effective utilization of time and resources. This Agile estimation technique is advised when the number of items to be discussed is large enough.
     

    6. Ordering Methodology
     

    In this Scrum estimation technique, there is a scale that ranges from low to high. The items to be discussed are randomly arranged on the scale. Team members are asked to place the items on the scale as per the items’ perceived value. However, there is a synchronized way to do so. Every participant is given a chance to move an object one step ahead or back. If a participant does not want to move the item, the opportunity is passed onto the next person. For each item, this process goes on until no team member wishes to move the item from its place. The exercise helps in getting a close-to-true picture of the size of the items. 

    The method is hugely successful in smaller groups. It should not be tried with bigger groups as it could be time-consuming. Also, ensure that the items to be discussed are large for the method to be effective.
     

    Conclusion
     

    Agile estimation techniques are events where the entire Agile team needs to participate. Best results are achieved when the team collaborates and is open-minded.  These estimation techniques are such that they do not give any team member a chance to blame another person for wrong estimates.  Most of the methods do not have a tracking system; hence, it is impossible to track who estimated what.

    Agile estimation techniques are faster than methods used in traditional systems, and they use relative units for sizing up items. These techniques depend wholly on the estimation powers of human beings. Many questions are asked during the estimation meeting related to designing, coding, unit testing, integration testing, and acceptance testing. One key feature of the agile estimation is consensus amongst all team members. Finally, it is vital to size items of similar points and size to all team members to ensure that the effort is consistent and equal.

     